You can skip this in seconds

Click here to continue

Download Now!

IProMonitor - Integrated Project Monitoring System 2.2.1

IProMonitor - Integrated Project Monitoring System 2.2.1

IProMonitor - Integrated Project Monitoring System Publisher's Description

IProMonitor is a multilingual multi-user project planning and project tracking system. It is a tool for executives to consider all commercial profit aspects of a project in a structured way and integrates all of its components within a comprehensive interface.

User Interface Screenshot

All functions and control elements of this system are accessible from an integrated user interface.

The navigation area on the left side contains the tree structures of the currently loaded projects. The dialog area on the upper right side houses all editing dialogs of this system, and the output area on the lower right side displays the application-internal information.

Time Recording Screenshot

The time spent by the members while working on the project will be booked from the records produced with this dialog and thus it is the basis for the commercial success of the project.

The surface of this dialog is separated into the work package selection table in the upper area, where all work packages the current user is assigned to are listed, and the time recording table in the lower area containing all times entered by the current user within the selected month.

Time Approval Screenshot

The actual times of project members are not booked until these times have been approved. With this Time Approval dialog the project manager is able to view the recorded times and release them for booking.

The member selection displays how many records for each project member are yet to be approved. By check-marking a time record in the right approval column of the details list the times defined in this check-marked row are provided for booking. If a totals record (work package / project phase / project) is check-marked within this details list all time records belonging to this totals record will be marked by the system and provided for booking. Booking itself is done by pressing the Save button.

Section Maintenance Screenshot

The function of sections is to bring about decisions with regard to specific project-related topics. Each section has to deal with specific tasks and consists of qualified project team members.

The topics and results of all project meetings can be stored within the system to have a complete documentation of all intentions in the course of the project.

Project Reporting Example

Project reports are generated as linked HTML files to be viewed with any Web Browser.

This report is useful both to archive a project and to have access to all project information when working offline (e.g. in a project meeting at the customer's site).

Look for Similar Items by Category

Feedback

Popular Downloads

  • Minecraft Minecraft 1.10.2 Build anything you can imagine.
  • Horizon Horizon 2.9.0.0 Innovative Xbox 360 modding tool.
  • Vidnoz AI Vidnoz AI 1.0.0 Generate Professional AI Videos from Text
  • Auto-Tune Evo VST Auto-Tune Evo VST 6.0.9.2 Corrects vocals or solo instruments.
  • Vector on PC Vector on PC 1.0 Vector, a side scrolling parkour inspired